Seed Silos

Specifications

ModelCapacity M3Capacity Wheat T(1)Max Load T(2)Height to Centre MHeight to Eave MNom. Diameter MOutlet Height mm (8)Bottom Outlet mmCone AngleAuger Length(3) M (ft)Footing Plan StyleWide Load Pilots (4)Centre Fill 500mmRoof Side Inspection Hole (6)Sight Glass Level (7) IndicationExternal Wall Roof Ladder & CageRemote Opening StandardBase ManholeAerationWhite Colorbond Walls RoofBagging ChuteSlide GateSealed Gastight
K4S18 1815174.943.1900(5)23032/42°8.3 (28′)4 LegNoneSTDOPTSTDOPTSTDSTDOPTOPTSTDOPTOPT
K4S24 2419225.84.93.1900(5)23032/42°9.9 (33′)4 LegNoneSTDOPTSTDOPTSTDSTDOPTOPTSTDOPTOPT
  1. Wheat capacity based on typical consolidated/compacted bulk density in silo.
  2. Max. Load based on engineering design. This may not apply to products other than grain.
  3. Auger lengths are indicative only and are based on 40° angle.
  4. Pilot/Escort vehicle requirements may vary in certain locations (e.g. metropolitan areas).
  5. Outlet height on skid base silos increases when placed on concrete footings. Ref. Footing Plans.
  6. Due to changes in OHS regulations, from Jan 2003 roof manhole and internal ladder are no longer supplied.
  7. One Sight Glass is standard in each ring. Additional Sight Glasses are optional.
  8. Nominal outlet height

Ordering Process

1. Orders

1. Orders

Kotzur's experienced sales team will help you find the best Storage Solution and delivery date to suit your needs.

2. Made to Order

2. Made to Order

All our silo parts are made to order at our factory based in Walla Walla (NSW). Other handling and processing parts are made at our factory based in Toowoomba (QLD).

Earthworks and Site Preparation

Earthworks and Site Preparation

Get ready for the installation of additional storage by completing any necessary earthworks.

Delivery and Installation

Delivery and Installation

Kotzur Silo delivery and building teams will be in touch with you to let you know when your order will be delivered and installed. The duration of the installation process varies depending of the complexity of the set up.